The Challenges
- Collaborative effort with Fusion Design and Paradigm to remodel the entire lobby from the 1990s to CLASS A Space
- Extensive floor leveling / concrete planter removal
- MEP modifications
- Complete remodel of 2 common area restrooms
- LED light fixtures, new drywall, cloud ceilings, and stepped soffits self performed by Paradigm carpenters
- New back painted glass directory
- Over $50,000 in value management achieved by Paradigm