Corporate
-
NAHunneman
-
KNF&T Staffing Resources
This project consisted of a 5,000 sq. ft. build out Pre-lease due diligence was provided to the property management group New HVAC and fire alarm systems were installed A custom reception work area was done in-house by Paradigm Reconfiguration of floor inclusive of all finishes: drywall, ACT, painting, carpet and millwork A new glazed entrance […]
-
Harvard Medical School – LMC 3rd Floor
Paradigm was the chosen partner for CM/GC services for Samuels & Associates to build out 20,000 sq. ft. of tenant space for Harvard Medical School Complete demolishing of 20,000 sq. ft. data center to shell space Pumped in over 150 cubic yards of lightweight concrete to level entire floor Complete new fit out with multiple […]
-
Food Should Taste Good
-
DMJM Harris
Paradigm was selected as the Construction Manager to build-out the new corporate office for DMJM/Harris. DMJM/Harris is one of the top 10 engineering firms in Boston who collaborated with Paradigm post 9/11 at Logan International Airport This 11,000 sq. ft. project was split into seven phases on two floors in order for DMJM to maintain […]
-
Dana Farber (Human Resources Fit-out Project)
Paradigm was selected as the Construction Manager for the demolition and renovation of the entire 3rd floor which was converted into 30,000 sq. ft. of office space for the Human Resource and Legal Departments. Scope of work included MEP upgrades, footprint reconfiguration and new finishes throughout the space This was a fast track project that […]
-
Dalbar
-
Intercontinental Management Group
-
BOSE Corporation
Transformed a once dark storage space into a state of the art acoustical complex. This project resulted in two high tech project demo rooms, a general marketing room and two audio visual control centers Transformed 5,000 s/f of storage space Special details to ensure that all areas were acoustically sound Oak flooring is supported on […]