• R_virgin2

    Virgin Atlantic Clubhouse

    In the tradition of Virgin Atlantic Clubhouses, the Boston Clubhouse wraps itself in an abstracted New England style. Borrowings from Boston’s historical past, present and future can be found in the choice of materials and textures selected are reminiscent of Boston’s historical past as well as present. This relaxing space is divided into four zones: […]

  • H_df1

    Dana Farber Cancer Institute (Cafeteria)

    Complete remodel of the existing main cafeteria for the Institute approximately 6,000 sq. ft. New ceramic tile, millwork, food service equipment and deli Custom millwork with eliptical and serpentine glass soffits that are suspended from the ceiling Seating received all new maple trim work and accent lighting HVAC, plumbing, fire alarm and electric were completely […]

  • H_dfcct1

    Dana Farber Cancer Institute

    Paradigm was selected by Dana Farber Cancer Institute to act as the Construction Manager as well as the General Contractor for the expansion of its radiology department This project included a multi-phased approach, with work completed after-hours to allow this fully occupied area of the hospital to remain operational during construction.  This is one of […]

  • H_st1

    St. Elizabeth’s Medical Center (Patient Room Renovations)

    Paradigm was selected by Caritas St. Elizabeth’s Medical Center for the complete renovation and remodel of eight (8) private patient rooms, including one isolation room. Work consisted of new electrical systems, fire alarm upgrades, HVAC including all med gases, sprinkler and plumbing.  Architectural work included Debolon flooring, wall protection and new Vistawall window systems. This […]

  • H_steliz2

    St. Elizabeth’s Medical Center (Department of Otolaryngology)

    Paradigm Construction Corporation transformed an existing patient floor to accommodate the new Department of Otolaryngology design/build surgery unit in less than 8 weeks together with JACA Architects and AKF Engineers.  This 9,000 sq. ft. renovation was completed on a fast-track schedule and included remodeling patient rooms, upgrades to the mechanical systems, construction of new vestibular […]

  • H_stelizabeth1

    St. Elizabeth’s Medical Center (Operating Room Renovations)

    Paradigm was selected by Caritas St. Elizabeth’s Medical Center for the complete renovation of eleven (11) operating rooms including all finishes, fire protection, plumbing, med gases, HVAC, electrical and fire alarm.  Also installed owner furnished items such as stainless steel recessed cabinets and assisted with their outside vendors.  A phased schedule was needed in order […]

  • C_nahunneman1

    NAHunneman

  • C_knft1

    KNF&T Staffing Resources

    This project consisted of a 5,000 sq. ft. build out Pre-lease due diligence was provided to the property management group New HVAC and fire alarm systems were installed A custom reception work area was done in-house by Paradigm Reconfiguration of floor inclusive of all finishes: drywall, ACT, painting, carpet and millwork A new glazed entrance […]

  • C_Harvard1

    Harvard Medical School – LMC 3rd Floor

    Paradigm was the chosen partner for CM/GC services for Samuels & Associates to build out 20,000 sq. ft. of tenant space for Harvard Medical School Complete demolishing of 20,000 sq. ft. data center to shell space Pumped in over 150 cubic yards of lightweight concrete to level entire floor Complete new fit out with multiple […]

  • C_food1

    Food Should Taste Good